How Long Does It Take to Build a Concrete Parking Lot?
Building a typical commercial concrete parking lot takes about two to four weeks of site work once permits and design are done,

Daniel Yoder is the owner of Yoder Laser Concrete, a commercial concrete contractor based in Millersburg, Ohio. The company places warehouse floors, industrial slabs, footings, walls and parking lots across Ohio, Indiana, Michigan, West Virginia and Pennsylvania.

Building a typical commercial concrete parking lot takes about two to four weeks of site work once permits and design are done,

Concrete is reinforced because it is very strong when squeezed but weak when pulled or bent. Its tensile strength is only about

A vapor barrier goes under an interior concrete slab, not on top of it. It is a plastic sheet laid over the

A well-built concrete parking lot typically lasts 25 to 30 years, and many go well past that with basic upkeep. The lots

Construction season in Ohio, for concrete and site work, generally runs from April through November. Work starts once the ground has thawed

Concrete sets within hours, can usually take foot traffic after 24 to 48 hours and car traffic after about 7 days, and

Most warehouse floor slabs are 6 to 8 inches thick, placed with concrete in the 4,000 psi range on a compacted stone

A concrete parking lot is usually 4 to 5 inches thick where only cars park, 6 inches or more where delivery trucks

Most concrete parking lots are sealed every 3 to 5 years with a penetrating sealer, and the joint sealant is checked every

To choose a concrete contractor in Ohio, check five things before price: whether they self-perform the work or broker it, whether they
Send your plans and an estimator replies within 24 hours. Commercial and industrial packages of 10,000 sq ft and up across Ohio, Indiana, Michigan, West Virginia and Pennsylvania.