Home » Parking Lots and Paving » How Often Should You Seal a Concrete Parking Lot?

How Often Should You Seal a Concrete Parking Lot?

Finished commercial concrete slab showing the saw-cut joint pattern

Most concrete parking lots are sealed every 3 to 5 years with a penetrating sealer, and the joint sealant is checked every year or two and replaced when it pulls loose. That is far less often than asphalt, which needs sealcoating every few years just to hold up. The right interval depends on the sealer you use, how much salt the lot sees in winter and how much traffic it carries. Brand new concrete should not be sealed until it has cured, usually about 28 days after the pour.

Do you need to seal a concrete parking lot?

Concrete does not need sealing the way asphalt does, but in Ohio a sealer earns its keep. Water and deicing salt soaking into the surface are what cause scaling, the flaking of the top layer, through repeated freeze-thaw cycles. A good penetrating sealer reduces how much water and salt get in without making the surface slippery.

Types of sealer and how long they last

Sealer typeHow it worksTypical reapplication
Penetrating (silane or siloxane)Soaks in and repels water from inside the surfaceEvery 3 to 5 years, sometimes longer
Topical (acrylic or similar)Forms a film on topEvery 1 to 3 years; can get slick and wear in traffic lanes
Joint sealantFills the sawed joints to keep water and grit outInspect every 1 to 2 years, replace as it fails

For parking lots and truck areas, penetrating sealers are usually the better choice because there is no film to wear off in the wheel paths. Always follow the product’s coverage rate and the conditions on the label, and test a small area first.

The joints matter more than the surface

If you only do one thing, keep the joints sealed. Open joints let water into the base, and a softened base is what makes panels settle, crack at the corners and break at the edges. A walk around the lot each spring to find failed sealant takes an hour and saves panel replacements later.

Other ways to protect a concrete lot

  • Use the right deicer. Plain rock salt is the least harmful common choice when used sparingly. Avoid ammonium nitrate and ammonium sulfate products, and skip deicers entirely on concrete in its first winter.
  • Clean regularly. Sweep grit and wash off oil, fuel and salt residue so they do not soak in.
  • Watch the drainage. Water that stands at the edges after rain softens the base. Fix inlets and edges that hold water.
  • Plow with care. Use a rubber edge on plow blades where you can, and avoid gouging the joints.
  • Seal cracks as they appear. Small cracks are cheap to seal and expensive to ignore.

When to reseal

Signs a lot is ready for another coat of penetrating sealer: water soaks in and darkens the surface quickly instead of beading, light scaling is starting in areas that get the most salt, or it has been about three years since the last application. Choose a dry stretch of weather and a clean, dry surface.

Building or replacing a lot?

A sealer protects good concrete; it cannot fix a thin pavement or a soft base. We build commercial concrete parking lots and truck courts designed for their traffic, and our post on how long a concrete parking lot lasts covers the rest of the upkeep. Send your site plan for a reply within 24 hours. The American Concrete Pavement Association has more on joint sealing.

Daniel Yoder, founder and owner of Yoder Laser Concrete, on a commercial jobsite

About Yoder Laser Concrete

An Amish-owned commercial concrete contractor in Millersburg, Ohio, founded by Daniel Yoder in 2000. Our own crews place warehouse floors, industrial slabs, footings, walls and parking lots across Ohio, Indiana, Michigan, West Virginia and Pennsylvania with owned Somero laser screeds. More about us

Keep Reading

More Commercial Concrete Guides

Capabilities About Us Projects Resources Service Area Akron, OH Canton, OH Cincinnati, OH Cleveland, OH Columbus, OH Dayton, OH Lorain, OH Parma, OH Toledo, OH Youngstown, OH (330) 231-3587 Invite Us to Bid →