Every slab below is one we placed, with the size, the location and the spec it was built to. No stock photography and no generated images.
Pouring the 800,000 square foot Amazon fulfillment floor in Maryland.
Sorted by what you are likely bidding. Each one lists the constraint that made it difficult and how it closed out.
Maryland · 800,000 sqft
Pour window constrained by the structural steel package. Automated picking required defined-traffic aisle tolerances across the full floor.
Super-flat spec passed
West Virginia · Somero S240
Single contiguous pour with active site operations adjacent. High-bay racking required FF 50+ across the full slab without phase breaks.
FF 52 achieved · Zero punch list
Ohio · 25,000 sqft
Sequential back-to-back pours with a constrained cure window between phases. High-bay racking required consistent flatness across all phases.
No cold joint issues · Zero rework
Pennsylvania · Heavy-load spec
Heavy-equipment load spec required a thickened slab and specialised mix. An active mining operation adjacent required strict dust and vibration controls.
Heavy-load spec met · Zero incidents
Akron, Ohio · Footer and slab
Combined slab and foundation footer package on a compressed municipal permit timeline. Self-performed from formwork through final slab placement.
On budget · Passed all inspections
Ohio · Two-year project
Multi-phase concrete package across 10 acres with 12+ pour phases, coordinated with the structural, MEP and civil trades.
All phases on schedule
Eighteen photographs, every one captioned, each captioned. Six captioned photos beat ninety-five anonymous ones, every time.
Every image is our own crew and our own equipment on commercial and industrial work.
GCs, developers and project owners across Ohio, Indiana, Michigan, West Virginia and Pennsylvania.
(330) 231-3587
Estimating · Monday to Saturday, 8am to 5pm ET