How Long Does a Laser Screed Concrete Floor Take?

If you are considering having a laser screed concrete floor installed, you should first consider the labor required. The laser screed can be expensive, but it also saves a lot of labor. Many contractors rent these machines instead of purchasing them, making them more affordable. Yoder Laser Concrete owns their laser screed equipment allowing them to have great response times for urgent projects. In addition, these machines are very accurate, which makes the process faster and less expensive.

The laser screed machine works by vibrating the concrete. Because the concrete is vibrated, there may be small uneven areas that result. These areas may produce water at different levels. Because the laser screed vibrates the concrete, the cement slurry stays on the surface. The concrete will then create regional water.

This process requires less labor than other methods, and the laser screed can complete the entire project in less than four hours. This means that the project can be completed quicker, and a smaller team can complete it. This reduces labor costs and increases productivity for the contractor. What’s more, laser screeds are durable and last a long time, saving the company time and money on repairs and maintenance.

A laser screed machine is an ideal solution for large-scale concrete leveling projects. Its advanced leveling head and laser system deliver excellent leveling effects. With high-quality imported engines, high-flow hydraulic system, and articulated design, the laser screed machine provides superior leveling results.

Laser screed technology has created new standards for the construction industry. Using lasers, concrete contractors can screed a thousand square meter concrete floor in as little as twenty-four hours compared to three to four days when using manual methods. Additionally, laser screeding requires less setup time and allows for greater accuracy and safety. Manual screeding is a labor-intensive process involving bending and high hand forces to pull a screed rod.

Another option for leveling concrete is the truss screed. This process requires two laborers, one pulling against the screed and one grading the concrete in front of the screed. The truss screed is more difficult to operate because of the amount of labor required. The rakers’ speed also varies. Consequently, one screeder may finish with the perfect screed height, while another may leave the floor too high or too low.

The process of leveling concrete is an essential one when pouring flatwork. A laser-guided screed will level concrete to a precision grade. In addition, it will require fewer workers and will result in a smooth surface. However, it is essential that the screed is in good condition, as a ruined screed will not perform well. This is because the screed may have dried concrete on it and will not run as smoothly and effectively.